Fig. 7From: Physical-based rainfall-triggered shallow landslide forecasting0–3 h lead-time landslide threshold curves for the upper slope at 39 K + 450 on T18 Highway. a Thresholds right at landslide occurence, b Thresholds at 3 h before landslide occurenceBack to article page